28/10/2009: TMT awarded Chevron 3 year with possible 3 year extension contract
On the 28th of October, TMT was awarded a Chevron 3 year with possible 3 year extension contract.

28/10/2009: TMT awarded Chevron 3 year with possible 3 year extension contract
On the 28th of October, TMT was awarded a Chevron 3 year with possible 3 year extension contract.





